Skip to content

Electrical · Mechanical · Control systems

Old plant, new control. Without replacing the line.

Over 35 years in industry, retrofitting ageing machinery with new, low-cost, reliable technology — plus the breakdown cover and maintenance to keep it running. Small and mid-size projects, UK-wide.

UK-wideSutton Coldfield, West Midlands

LINE 1 — OVERVIEWPUMPVALVETANK 01THROUGHPUT · 24HFLOW42.6 m³/hTEMPERATURE62.4 °CSTATERUNNING
Illustration — SCADA overview screen
  • Over 35 years in industry
  • Qualified electrical & mechanical engineers
  • Siemens-trained
  • Public liability insured
  • UK-wide coverage
  • 40+ projects delivered across Europe

Services

From a single fault to a full retrofit.

Electrical, mechanical and control systems engineering under one roof — so nobody has to co-ordinate three trades to get a machine running again.

Horner Automation

Smart automation: PLC, HMI and OCS360 Remote.

Horner’s all-in-one controllers put the PLC, operator screen, I/O and networking in one unit — a lower starting cost, less wiring and panel space, and room to expand. Add OCS360 for cloud dashboards and remote programming when the job needs it.

Horner Canvas 7D all-in-one controller with colour touchscreen
  1. 01ControlHorner PLC + HMI — sequence, interlocks, operator screens and alarms
  2. 02DataModbus, Ethernet and CAN — drives, instruments, trends and diagnostics
  3. 03ConnectOCS360 + OCS360 Remote — monitoring, alarms and remote debugging

40+ projects across Europe · no hardware or software failure

Platforms

The controllers we work with.

Sectors

Where the work tends to come from.

  • 01Plastics
  • 02Greenhouse technology
  • 03Heavy industry
  • 04Cooling & heating
  • 05Food & beverage
  • 06Packaging
  • 07Automotive
  • 08Water & wastewater
  • 09OEM machine builders

Approach

“Automation Technology Solution was built with a simple vision: to make industrial automation more accessible, efficient, and result-focused for businesses of all sizes. Instead of overcomplicating systems, we focus on understanding real operational challenges and connecting businesses with the right automation technology solutions.”
  • Small and mid-size projects are the pointNot what we take when the big jobs dry up — what we are built around. Plenty of integrators will not quote them. We will.
  • Retrofit before replaceOld technology swapped for new, low-cost, reliable alternatives. Most lines do not need replacing; they need bringing up to date.
  • Match the technology to the jobThe right solution for the business in front of us, not the largest one available.
  • Keep the system simpleSystems that are not overcomplicated are the ones still running long after the engineer has left.

Tell us what’s wrong.

The machine, the PLC make, what it’s actually doing. The more you can tell us up front, the better the answer we come back with.